Panel Elektro
SOME OF OUR PROJECT NEWS
PANEL ELEKTRO SANAYI VE TICARET A.S.
Emek Mah. Onur Cad. No:51 34785 Sancaktepe - Istanbul - TURKEY
Tel : +90 216 621 00 00 (pbx) Fax: +90 216 621 00 09
Honeywell A.S.
Tengiz Chevroil TCO HVAC Project LOGSTRUP Withdrawable MCC and BMS Panels (Form4b) production continues.

ITSC LTD / Voltec
Serchinar Water Pump Station Project Pump Control Panels and PLC & Scada System production continues.

Noor Solar Systems / LTi Reenergy GmbH
Various Photovoltaic Plant Projects Cabinets for On grid Invertor Panels production continues.

Magaldi Power S.p.A.
Factory Acceptance Tests (FAT) of the Tenaris Tamsa Project (Mexico) Junction Boxes, Main Control (PLC) Panels and Local Panels have been completed successfully.

Magaldi Power S.p.A.
Factory Acceptance Tests (FAT) of the Logan Aluminyum Incorporated Hot Shred Transfer SYS Project (USA) Junction Boxes, Main Control (PLC) Panels and Local Panels for Line B have been completed successfully.

Genel Sistem Dizayni (GSD) A.S.
KAYALI Combined Cycle Power Plant Project - Osmaniye LOGSTRUP Withdrawable MCC Panels (Form4b) production continues.

Integrol Integrated Control Systems
Kemiteks A.S. Expansion Project PFlex® MCC Panels have been completed successfully.

ARTI Industrial Automation
Kemiteks A.S. Expansion Project PFlex® MCC Panels have been completed successfully.

ITSC LTD / Voltec
Serchinar Water Pump Station Project Pump Control Panels have been completed successfully.

Nurol Makina ve Sanayi A.S.
22" Industrial Work Stations for the Nurol Makina ve Sanayi A.S. have been delivered.

AR-EKS Otomotiv San. Tic. Ltd. Sti.
22" Industrial Work Stations for the AR-EKS Otomotiv San. Tic. Ltd. Sti. have been delivered.

Akenerji Power Generation Inc.
Akenerji Power Generation Inc. Steam Turbine Lot 5 Panels Logstrup Form4b Withdrawable type MCC have been completed successfully.

IRING DOOEL
Factory Acceptance Tests (FAT) of Heating Plant - Istok BEG Skopje Panels have been completed successfully.

Proge Engineering
22" Industrial Work Stations for the Proge Engineering have been delivered.

Magaldi Power S.p.A.
Factory Acceptance Tests (FAT) of the Red Dragon Power Plant project J-BOX, UPS, Local Panels have been completed successfully.

Magaldi Power S.p.A.
Factory Acceptance Tests (FAT) of Isalnita Power Plant Bottom ASH Handling project (Romanya) J-BOX, UPS, Local Panels have been completed successfully.

Magaldi Power S.p.A.
Factory Acceptance Tests (FAT) of Logan Aluminyum Incorporated Hot Shred Transfer SYS project (Amerika) J-BOX ve PLC Panels have been completed successfully.

AR-EKS Otomotiv San. Tic. Ltd. Sti.
22" Industrial Work Stations for the AR-EKS Otomotiv San. Tic. Ltd. Sti. have been delivered.

Aksa Akrilik Kimya Sanayii A.S. (AKSA)
Aksa Akrilik 2.Phase Distribution Panels LOGSTRUP Withdrawable and Plug-in PCC (Transformer Main Distibution 13.6 MWa) Panels (Form3b) for the Aksa Akrilik Kimya Sanayii A.S. have been delivered.

Siemens A.S.
Tupras Kirikkale Refinery Mosaic Mimic Panel Design, Production and Site Commissioning for the Siemens A.S. have been delivered.

Magaldi Power S.p.A.
MA'ADEN Saudi Arabia MCC Panels for the Magaldi Power S.p.A. have been delivered.
2017