TYPE-1 VS. TYPE-2 COORDINATION IN MOTOR CONTROL CENTERS (MCC)
In Motor Control Center engineering, circuit breakers or fuses, contactors, overload protection and other motor-starter components should not be selected as isolated devices. IEC 60947-4-1 defines coordination requirements for motor-starter combinations so that their behaviour after a short-circuit event can be evaluated as a complete protective and switching arrangement.
What is Motor-Starter Coordination According to IEC 60947-4-1?
Type-1 and Type-2 coordination describe the permissible condition of a motor-starter combination after a short circuit has been cleared. In both cases, the fault must be interrupted without danger to people or the installation. The main difference is the level of damage that may be accepted within the tested combination and the extent of intervention that may be required before the feeder is returned to service.
Type-1 Coordination
The short circuit is cleared without danger to people or the installation, but the starter or associated components may require inspection, repair or replacement before the feeder is returned to service.
Type-2 Coordination
The tested starter combination is intended to remain suitable for further use after fault clearance, subject to the conditions permitted by IEC 60947-4-1 and the manufacturer's verified coordination data.
Tested Combination
Coordination should be checked for the actual protective device, contactor, overload protection, system voltage, motor rating and prospective short-circuit current specified for the project.
Core Differences Between Type-1 and Type-2 Coordination
| Engineering Consideration | Type-1 | Type-2 |
|---|---|---|
| Short circuit cleared without danger to people or installation | Required | Required |
| Starter component damage after the fault | May be permitted within the coordination requirements | Functional damage is more restricted; permitted contact welding may be accepted under defined conditions |
| Repair or replacement before return to service | May be required | Normally intended to be avoided for the verified combination, subject to inspection and manufacturer instructions |
| Project emphasis | Safe fault clearance with an acceptable repair strategy | Safe fault clearance with greater emphasis on post-fault serviceability |
| Selection basis | Manufacturer coordination tables and the exact project electrical conditions | |
What Happens After a Short-Circuit Event?
During a short circuit, the protective device must interrupt the fault while limiting the thermal and electrodynamic stress imposed on the downstream switching equipment. The condition of the starter after fault clearance depends on the coordination type and the verified device combination.
With Type-1 coordination, the starter can require component intervention after the fault. With Type-2 coordination, the verified combination is intended to remain suitable for further use under the conditions defined by the applicable standard and manufacturer. Limited contact welding may be permissible when it can be separated in accordance with the manufacturer's instructions without unacceptable deformation.
When is Type-2 Coordination Relevant in an MCC?
Type-2 coordination can be considered where the consequences of replacing starter components after a short-circuit event are operationally significant. The requirement is particularly relevant when the project places greater emphasis on feeder serviceability, structured maintenance and reducing avoidable component replacement after fault clearance.
- Process plants: motor-driven production systems where feeder availability affects process continuity.
- Water and pumping systems: pumps and auxiliary motors that form part of a continuous operating process.
- Heavy manufacturing: production lines using multiple contactor starters, soft starters or motor feeders.
- Data center mechanical systems: selected cooling and auxiliary motor loads where the project specification requires a defined coordination philosophy.
Why Tested Device Combinations Matter
A common design mistake is to specify Type-2 coordination as if it were an independent rating of the MCC enclosure or of one individual device. In practice, coordination is established for a specific combination of protective and switching components.
Manufacturer coordination tables typically identify the applicable protective device, contactor or starter, overload protection, rated voltage, motor rating and short-circuit level. A device combination that satisfies the required coordination level at one electrical rating should not automatically be assumed to provide the same result under different project conditions.
Type-1 / Type-2 Coordination in MCC Engineering
Coordination type is one part of the overall motor-feeder design. It should be evaluated together with the prospective short-circuit current, motor rated current, starting method, overload trip class, utilisation category, protection-device selection and the required fixed, removable or withdrawable functional-unit arrangement.
Where VFDs, soft starters or other electronic motor-control equipment are used, the complete feeder architecture and the manufacturer's applicable protection recommendations should also be considered. The objective is therefore not simply to specify a “Type-2 MCC”, but to select and verify the appropriate motor-feeder combination for each application.
Project Information Required for Coordination Evaluation
For a project-specific MCC evaluation, the following information is normally required:
- single-line diagram,
- motor list / load list,
- motor ratings and starting method,
- system voltage,
- prospective short-circuit current,
- technical specification,
- required coordination type, where specified.