

|
We are once again in Sakhalin. Panel Elektro has been prefered once again by BETS B.V. and Honeywell, for the new buildings of the Sakhalin II Onshore Processing Facility, the second part of the project which had been previously delivered in 2005. Our company has produced the HVAC control panels within the scope of the project and upon the final approval of WorleyParsons which have executed the engineering design of the project, the delivery of our panels have been made. |